Skip to content. | Skip to navigation

Incremental launching method

Bridge construction by incremental launching with ENKOFORM HMK. Each stretch of the bridge deck is manufactured in a fixed pre-fabrication area behind the abutment. Each new stretch is joined to the previously built and pushed by a hydraulic system, so that the bridge deck is sliding on the piers previously built.

If you are interested in ULMA Construction Bridge Formwork, we will be happy to find a cost-effective solution for your needs. Contact us for advice under no obligation.

Contact us